Sample
AquaPure RO 7-Stage: Setup
Model AP-700 · Wall-mount RO + UV + copper
1. Before you start
Check input water TDS. Above 2000 ppm, call service before installing.
2. Mount and connect
Fix the bracket 1.2 m above the floor; connect the inlet valve and drain line.
3. First flush
Run and discard the first two tanks of water.
Filter change
Sediment every 6 months; RO membrane every 18–24 months.